In all honesty there is still a long way to go but check out what's been done in a week:
Bricks! We have bricks. These are our bricks.
Not the whole house has been done but most of it is weather proof.
Look! Roof tiles on the roof! And Tom with our SS inspecting toolshed antiques.
Roof glorious roof.
Tom on a mission.
The noggings, they be measured.
Someone else's noggings.
Electrical and plumbing is in!
Remember the doors lying in the rain? This is what happened. The SS was notified. He was not impressed.
Looking back at the kitchen. Windows look a bit fuzzy.
Because they have "goop" on them. The goop I believe is there to protect the windows from scratches and dust while they work. Makes sense to me.
The bricks, they be blue.
This was the only full house angle I could get today with all the trucks and cars in front of our house. So stay posted for those pics!
Site Start Date: Sept 3 2012
Slab Complete: Sept 15 2012
Frame Complete: Oct 4 2012